Substatıon Installation Test and Commisioning
We can install to 154 kv - 380 kv transformer substation. According to project that it is determined by all necessary feasibility with underground and above energy transportation at the process of establishment of the substation.
- Construction of field grading, expropriation border, wire fence around switchgear, sewing precast pillar in the transformer substation.
- Construction of support bases for electrical materials.
- Construction of steel construction pylon bases.
- Grounding line.
- Construction of switchgear conduits and covers.
- Manufacture and installation of field distribution boxes.
- Installation of MCM conductor lines.
- Current Voltage transformer, circuit breaker, disconnector, surge arrester, line trap, power transformer installation.
- Assembling of support-passages, chain insulators, tensioners and suspension sets.
- Manufacture and installation of relay and control panels.
- Assembling of power and secondary wiring.
- Construction of support bases for electrical materials.
- Construction of steel construction pylon bases.
- Grounding line.
- Construction of switchgear conduits and covers.
- Manufacture and installation of field distribution boxes.
- Installation of MCM conductor lines.
- Current Voltage transformer, circuit breaker, disconnector, surge arrester, line trap, power transformer installation.
- Assembling of support-passages, chain insulators, tensioners and suspension sets.
- Manufacture and installation of relay and control panels.
- Assembling of power and secondary wiring.
Substatıon Site Tests
Performing Primer and Seconder tests at HV-MV-LV Switchgear, performing protection maintenance periodically, earting measurements ( according to Wenner and Selvaz method), we find a solution with expert engineers and experienced staff in the areas of electrical power, harmonic and thermal analysis.