Power Plants, Factories, Malls, HV-LV Substation Periodical Maintenance
Electricity Generation and Distribution Facilities, Factories, AVM and 154 kV - 380 kV Transformer Centers; We are able to perform periodic preventive maintenance of the facilities with our experienced cadres. The main purpose is; Maintenance / repair / parts replacement of equipment, especially those directly affecting production facilities, in pre-determined times to reduce the frequency of failure.
'Periodic / Planned Care and Rehabilitation Aims;
- Quality, safe and continuous energy production
- Increase the efficiency of the facility and substation to the highest level
- Reduce production costs
- Reduce unexpected failures
- Minimize the use of unnecessary materials
- Minimize unwanted events, trip and unplanned loads, etc
- Prevent premature failures by pre-detecting faults
These main criteria are the factors directly affecting the performance of the facilities and substations.
- HV SUBSTATION TESTS
- TRANSFORMER SUBTATION
- GIS
- MV - LV SWITCHYARD
- Distribution Panels
- Motor Control Panels
- Metal Clad Panels
- Modular Panels
- OG Panels
- ROTARY MACHINES
- Genertors
- Motors
- TRANSFORMERS
- POWER TRANSFORMERS( >5 MVA )
- Distribution Transformer ( < 5 MVA )
- Reactors and Special Type Transformers
- CIRCUIT BREAKER
- SF6 filled Type
- Vacuum Type
- Oil Type
- DISCONNECTOR
- Internal Disconnectors
- External Disconnectors
- Pantograph Disconnector
- CURRENT TRANSFORMERS
- VOLTAGE TRANSFORMERS
- CAPACITOR BANKS
- SURGE ARRESTERS
- POWER CABLES
- NEUTRAL EARTHING RESISTANCE
- BUSDUCTS
- DC BATTERY AND UPS
- TRANSFORMER OIL ANALYSES
- CONTROL AND PROTECTION RELAY SET AND TESTS
- EARTHING MEASUREMENTS
Periodical Maintenance and Installation
- HV SUBSTATIONS
- DOUBLE BAS SWITCHYARD
- GIS
a. HV SWITCHYARD PERIODICAL MAINTENANCE TESTS
- Transformer Tests
- Surge Arrester Tests
- Neutral Earthing Resistance Tests
- Voltage Transformer Tests
- Current Transformer Tests
- Circuit Breaker Tests
- Disconnector Tests
- Cable Tests
- D.C Voltage Control
- Protection Relay Set and Tests
- Measurement Device Tests
- Earthing Resistance Tests
- Ups ve Battery system Tests and Controls
b. HV Switchyard Maintenance, Installation and Repair- Transformer Maintenance, Repair and Replacement
- Surge Arrester Maintenance, Repair and Replacement
- Neutral Earthing Resistance Maintenance, Repair and Replacement
- Voltage Transformer Maintenance, Repair and Replacement
- Current Transformer Maintenance, Repair and Replacement
- Circuit Breaker Maintenance, Repair and Replacement
- Disconnector Maintenance, Repair and Replacement
- D.C Voltage Control
- Ups and Batterty System Maintenance
- Mechanical Control, Lubricate and Cleaning
- Primer ve Seconder Connection and Cabling Control
- SF6 and Vacuum Control , SF6 Supplemet and Leak Control
- Busduct Control and Torquing
- Protection Relays Replacement
- MV - LV SWITCHYARD
- Distribution Panels
- Motor Control Panels
- Metal Clad Panels
- Modular Panels
- OG Panels
MV-LV SWITCHYARD PERIODICAL MAINTENANCE TESTS
- Busduct DC Insulation Resistance Measurement
- D.C Hi-Pot Tests
- Voltage Transformer Tests
- Current Transformer Tests
- Circuit Breaker Tests
- Disconnector Tests
- Busduct Contact Resistance Tests
- Control Relay Set and Tests
- Measurements Devices Tests
- Ups and Battery System and Tests
MV-LV Switchyard Maintenance, Installation and Repair- Voltage Transformer Maintenance, Repair and Replacement
- Current Transformer Maintenance, Repair and Replacement
- Circuit Breaker Maintenance, Repair and Replacement
- Disconnector Maintenance, Repair and Replacement
- Mechanical Control, Lubricate and Cleaning
- Primer ve Seconder Connection and Cabling Control
- SF6 and Vacuum Control , SF6 Supplemet and Leak Control
- Busduct Control and Torquing
- Protection Relays Replacement
- ROTARY MACHINES
- Generators
- Motors
Rotary Machines Periodical Maintenance Tests
- Tip Up ( % PF, Tan?, Capasitance ) Tests
- Insulation Tests
- D.C High Voltage Withstand Tests
- DC Resistance Tests
- Rotor Winding Empedence Tests
- Pole Voltage Tests
- Generator Rotor and Stator Drying
- TRANSFORMERS
- Power Transformers ( >5 MVA )
- Distribution Transformer Tests( < 5 MVA )
- Reactors and Special Type Transformers
Transformatör Periodical Maintenance Tests
- Power Factor ( % PF, Tan?, Kapasite ) Tests
- Exciting Current Tests
- Insulation Resintance Tests
- Transformer Turn Ratio Tests ( Each tap )
- Windings Resistance Tests ( Each tap )
- Frequence Response Analysis ( FRA )
- Bushing Tests
- Inductance Tests
Transformer Maintenance and Installation
- Power Transformers Complete Field Assembly
- Transformer Field Oil Filling / Vacuum and Treatment
- Transformer oil samples for electrical tests and dissolved gas analysis
- Functional control and verify of buchholz relay alarm and trip
- Functional control and verify of pressure relief trip
- Control panel,components and wiring control
- On load tap changer control , test and maintenance
- Checking and adjusting the arc horns
- Torque check of H.V,M.V and L.V connection
- Current transformer terminal control
- Earthing connection control of transformer and equipments
- Prufy the trasformer from dust and oil
- Local and total paint-works of transformer tank and equipments
- BREAKERS
- Vacuum Circuit Breakers
- SF6 Circuit Breakers
- Low-level oil Circuit Breakers
Circuit Breaker Periodical / Fault Maintenance Tests
- Power Factor ( % PF, Tand, Capt. ) Tests
- Insulation Resistance Tests
- Open-Close Timing Tests ( contact operation timing)
- Contact Resistance Tests
- SF6 Gas / Vacuum Tests
Circuit Breaker Maintenance & Installation- Circuit breakers open-close coil control
- Circuit breaker spring charge motor control
- Circuit breaker spring control
- Circuit breaker secondary cabling control
- Circuit breaker to bus connection point maintenance
- Prufy and lubrication of movable mechanism of circuit breaker
- Circuit breaker SF6 , vacuum level control and adding
- SWITCHES
- Internal Disconnecting Switches
- External Disconnecting Switches
- Pantograph Disconnecting Switches
Disconnecting Switch Periodical / Fault Maintenance Tests.- Contact Resistance Tests
- Contact Pressure Tests
- Disconnecting Swicth Insulators Insulation Resistance Tests
Disconnecting Switch Maintenance and Installations- Contacts controls and maintenance
- Prufy and lubrication of movable mechanism
- Control and cleaning of insulators
- Adjustment of mechanism
- Checking the control panel and components
- Measurement of motor current value after maintenance
- Cleaning and lubrication of bar connections
- Control of disconnecting switch motor
- Renewal of disconnecting swicth motor
- Insulator changing
- Repair and changing og mechanical equipments
- Bearing, gasket and rings changing
- Control panel equipments repair and changing
- Current TRANSFORMER
Current Transformer Periodical / Fault Maintenance Tests- Power Factor ( % PF, Tand, Capt. ) Tests
- Insulation Resistance Tests
- Rato Tests
- Doyma Testleri
- Saturation Tests
- Polarity Tests
- Winding Resistance Tests
- Current transformer secondary terminal cabling control
- Oil level control at oil type current teansformer
- Primary connection control and cleaning
- VOLTAGE TRANSFORMER
Voltage Transformer Periodical / Fault Maintenance Tests- Power Factor ( % PF, Tand, Capt Tests
- Exciting Current Tests
- Insulation Resistance Tests
- Voltage Turn Ratio Tests
- Winding Resistance Tests
- Voltage transformer terminal cabling control
- Primary connection control and cleaning
- CAPASITOR BANKS
Capasitor Bank Periodical / Fault Maintenance Tests- Power Factor ( % PF, Tand, Capt. ) Tests
- Capasitance Tests
- Insulation Resistance Tests
- Current Transformer Tests
- Current Limiting Reactor Tests
- Control and elimination of oil leakage of capacitors
- Capacitor,current transformer and current limiting reactor detailed cleaning
- Capacitor,current transformer and current limiting connection and torque control
- Capacitor changing
- Capacitor and current transformer busings changing
- Connection lines changing
- SURGE ARRESTORS
Surge Arrestor Periodical / Fault Maintenance Tests- Power Factor ( % PF, Tand, Cap. ) Tests
- Izolasyon Direnci Testleri
- Earthing Resistance Tests
Surge Arrestor Maintenance and Installations- Checking counter
- Checking earthing connector
- Checking the primary connection and cleaning the surge arrestor
- POWER CABLES
Power Cables Periodical / Fault Maintenance Tests- Power Factor ( % PF, Tand, Capt. ) Tests
- Insulation Resistance Tests
- D.C High Voltage Withstand Tests ( Hi-pot )
Power Cables Maintenance and Installation- Internal and external header control of power cable
- Control of addition points and connections
- Installation of Internal and external power cable termination
- Power cable insertion
- NEUTRAL RESISTANCE
Neutral Resistance Periodical / Fault Maintenance Tests- Insulation Resistance Tests
- D.C Resistance Tests
- Neutral Resistance Current Transformer Complete Tests
- Neutral Resistance Voltage Transformer Complete Tests
Neutral Resistance Maintenance and Installation- Control and Cleaning of neutral resistance bushings
- Control of physical condition
- Insulator replacement
- Mechanical equipments repairs and replacemesnt
- Current transformer replacement
- Voltage transformer replacement
- Resistance bloc replacement
- BUS AND BUSDUCT
Bus and Busduct Periodical / Fault Maintenance Tests- Insulation Resistance Tests
- Dielectric Withstanding Tests
Bus and Busduct Maintenance and Installations- Insulators cleaning and controls
- Generator and transformer side connection torque controls
- Earthing connectors controls
- DC BATTERY AND UPS
DC Battery and UPS Periodical Maintenance Tests- Check of connection cords, jack, busbar, conductivity
- Capacity, voltage and electrolyte density tests
- Faulty or low-capacity socket detection
- Battery capacity and efficiency tests under load
- TRANSFORMER OIL TESTS
Transformer Oil Electrical, Chemical and Phisical Tests- Dissipation Factor ( Tand )
- Breakdown Voltage
- Water Content
- Appearance of Colour
- Neutralisation Value
- Interfacial Tension
- Viscosity of Oil
- Corosive sulfur
Dissolved Gas Analysis in Transformer Oil- Hydrogen
- Methane
- Ethane
- Ethylene
- Acetylene
- Propana
- Propylene
- Carbon monoxide
- Carbon diokside
- Total dissolved gas
- Total combustion gas
- PROTECTION AND CONTROL RELAY SYSTEMS
- OVER CURRENT / EARTH FAULT PROTECTOIN RELAYS
- DIFERANTIAL RELAYS
- DISTANCE PROTECTION RELAYS
- GNERATOR PROTECTIONS RELAYS
- BUS BAR PROTECTION REALYS
- LOW / OVER VALTAGE PROTECTIONS RELAYS
- Protection and Control Relays setting and Tests
- Protectin and control relays systems settings and tests
- Transducer tests
- Measurement instruments tests
- EARTHING TESTS
- Facility Soil Specific Resistance Measurements (Wenner and Selvaz)
- Facility step and contact voltage measurements (Wenner and Selvam)
- Transformer operation grounding resistance
- Transformer protection earth measurement